Dear all,
Can somebody explain me how to create a procesmap in Aris BPMN? More specificly wich model type I have to use?
Tank you in advance!
With kind regards
Charlotte
Hi,
I maybe have a similar problem:
I created a "Funktionsbaum (function tree?)" and also a "value-added chain diagram" and tried to link it to "bpmn 2.0 collaboration diagrams" (ARIS BA 7.1). However I cannot choose the model type bpmn2.0 collaboration from the list od models you can link. Why is that happening?
Thanks
Yvonne
This was fixed in 7.1 SR 8 if I remember it correctly. I just confirmed in my 7.1 SR 9 installation that it is possible to assign a BPMN Collaboration Diagram to a function that is part of a VACD or a Function Tree.
I assume that you have an installation somewhere between SR 5 and 7. You will have to do an upgrade of your installation.