Hello,
We are using 9.8 Design Server using embedded database (i.e Postgresql).
We want to upgrade to use Oracle 11g.
Do I need to setup separate Design Server with oracle in different server and then perform export/import?
OR
Is there way to change existing setup configuration with oracle database details?
Can anyone help by providing the procedures for same?
Best Regards,
Pranav