Hello,

We are using 9.8 Design Server using embedded database (i.e Postgresql).

We want to upgrade to use Oracle 11g.

Do I need to setup separate Design Server with oracle in different server and then perform export/import?

OR

Is there way to change existing setup configuration with oracle database details?

Can anyone help by providing the procedures for same?

Best Regards,

Pranav 

 

 or register to reply.

Notify Moderator