Hi
Is it possible to Synchronise the Solman project with ARIS, where the models are modeled in epc row display format?
I have an ARIS database wherein the levels are defined and the lowest level is modeled as EPC(row display). we have also used some SAP objects in the models. Now if I transfer a project from Solman to ARIS and do the synchronisation from Solman to ARIS, Will this work. does it support epc row display? I am looking for Solman to ARIS synch.
Thanks.
Regards,
Anupama
Roy de Vries on
You can change the models corresponding to the SAP hierarchie used. This is possible by changing the method configuration for models and objects used in the synchronisation.
Goto View, Options and go tho the tab displayed below. Preferrably you define a new method configuration to make sure you and your colleagues use the same configuration. The settings below can be used for testing purposes.