Hi all,
I'm looking for documentation on assignment configuration: witch kind of models are assignable to specific objects?
In particular I'm working with BPMN Collaboration Diagram (2.0Beta) and I'd link to join it to a superio object similar to value-add object of Value-add chain diagram.
Is it possible to customize assignments?
many thanks,
regards
Maria Sole
Assignments can only be customized from the standpoint that you can choose which existing assignments you want to allow by including them in your method filter. You cannot add new assignments that don't currently exist in the ARIS method.
Typically the various Allocation diagrams in ARIS can be assigned to a Function object which should allow the Value-added chain object. However, the BPMN method is more restricted than other ARIS methods as it is based on the standard. I was able to assign the BPMN Allocation Diagram (BPMN 1.v) to a VAC object but the (BPMN 2.0 beta) one. Perhaps this is because of the "Beta" and that capability hasn't been provided yet or perhaps it is by design?