Hi all
I need to simulate a loop using BPMN. I know it is possible to do with EPM attribute condition on EPC process. But I can't use EPM attribute in BPMN
How I can difine Loop conditions on BPMN to simulate processes?
My simulation tool is BPA Suite11gR1 which is based on ARIS 7.0 SR 6.
thanks for your help