I am creating a BPMN diagram and assigning a System or a RACI to a specific task. When I do this, a functional allocation diagram is automatically created and the link button appears next to the task. If I remove the link manually, it removes my system and raci inputs on the task.  I am using Aris basic. 

I do not want a FAD to be created for every single task that has data point on it ( like system) and I do not want the link to appear next to the task. Is there a way around this? 

Thank you!

 or register to reply.

Notify Moderator