Hi,

 

I'm using EPC with columns to draw some process. 

My process has activities within a system, and some events of this activities have integration with other system, as attached.

Anyone can help me? in short, i have to show integration of systems in a business process. for example:

1) activity: write a report - this activity is connected to the system a

2) event: report is created

3) connected to the event i have a integration to the system b, where this system receive this report and stop the payment.

how can i do this?

 

 

 or register to reply.

Notify Moderator