Dear Aris Commnity,
I´m writing my master thesis with ARIS Archtitect 9 and try to simulate an model with EPC. In this context the following problem/ question appeared:
I have assigned a technical resource to a function. In my case, the technical resource is a machine. The machine (technical resource) requires 5 machines to execute the function. The function has a processing time of 5 minutes. If now the process is run through once (process instance =1) under the assumption that only the described function above exists, then the processing time of the process is equal to 5 minutes and the processing time of the machine (5 machines * 5 minutes) is equal to 25 minutes.
My question is, can the processing time of the technical resource be integrated into the simulation-based evaluation of the processing time of the process? So that the simulation result of the processing time of the process would be 25 minutes and not 5 minutes
I would be very grateful for your help!
Nice regards
Antonius Hammerlage